I’m trying to change the order of the two pools assigned to my F5 GTM wide IP. I have a playbook and with this playbook I’m able to change the load balance method but when I change the order for the pools nothing happens. I don’t get an error it just doesn’t change anything. Has anyone else had this experience.
- name: Change pool order
 bigip_gtm_wide_ip:
 pool_lb_method: global-availability
 name: wide-ip-1
 type: a
 pools:
- name: pool-1 -----> pool-1 is currently set to order of 0
 order: 1
- name: pool-2
 order: 0 -----> pool-2 is currently set to order of 1
 provider:
 server_port: 443
 server: “{{ inventory_hostname }}”
 validate_certs: no
 delegate_to: localhost