# Change order of GTM wide ip pools

**URL:** <https://forum.ansible.com/t/change-order-of-gtm-wide-ip-pools/36834>\
**Category:** Ansible Project\
**Created:** [July 12, 2022, 4:14pm UTC](https://forum.ansible.com/t/change-order-of-gtm-wide-ip-pools/36834 "2022-07-12T16:14:00Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Sharon\_Day](https://avatars.discourse-cdn.com/v4/letter/s/94ad74/32.png) [@Sharon\_Day](https://forum.ansible.com/u/Sharon_Day)\
**Post date:** [July 12, 2022, 4:14pm UTC](https://forum.ansible.com/t/change-order-of-gtm-wide-ip-pools/36834/1 "2022-07-12T16:14:00Z")

</div>

I’m trying to change the order of the two pools assigned to my F5 GTM wide IP. I have a playbook and with this playbook I’m able to change the load balance method but when I change the order for the pools nothing happens. I don’t get an error it just doesn’t change anything. Has anyone else had this experience.

- name: Change pool order  
bigip\_gtm\_wide\_ip:  
pool\_lb\_method: global-availability  
name: wide-ip-1  
type: a  
pools:
- name: pool-1 -----\> pool-1 is currently set to order of 0  
order: 1
- name: pool-2  
order: 0 -----\> pool-2 is currently set to order of 1  
provider:  
server\_port: 443  
server: “{{ inventory\_hostname }}”  
validate\_certs: no  
delegate\_to: localhost
